School Construction
Project Scope
The Board of Trustees approves school locations prior to construction based on demographic projections. As of right now, Elementary School #32 is proposed to be located in the west part of the district in the Travisso neighborhood [map]. Design for this school is underway. The school is projected to open in 2028, using the same innovative design used for recent elementary schools.
The timing of all future construction projects is dependent upon multiple factors, including enrollment trends, facility needs, and any related Board action.
Project Status
- Spring 2024
Work on this project will begin with the Design phase. - August 2023
At the Aug. 24, 2023 Board meeting, Trustees approved the architect and construction manager.
Project Details
Phase
Estimated Timeline
Start: Spring 2024 (Start of Design phase)
Finish: Fall 2028 (Dependent on enrollment projections)
Funding Source
Bond 2023
Estimated Project Budget
$79,944,260
Guaranteed Maximum Price (GMP) *
GMP(s) will come later in the process and go before the LISD Board for approval.
* GMPs cover construction costs only. The total project cost will incorporate design and permitting fees, along with furniture, fixtures and equipment. Additional GMPs are possible.
Note: The actual cost will be listed here upon project completion. Any money leftover from the budget goes into project savings, managed by the Bond Oversight Committee.
Contractors
- Architect: Pfluger Architects
- Construction: American Constructors
- Engineer
- Mechanical, Electrical, Plumbing: MEP Engineering
- Structural: Pickett, Kelm & Associates
- Civil: AtkinsRéalis